• GERES WPP

Electricity Generation

150.000.000 kWh/year

Installed Capacity

12 x 2,5 MW (Nordex N90 – 2500)

30 MWm / 30 MWe

Year of Commissioning

2014

Location

Dualar Köyü Mevkii, Kırkağaç, Manisa While driving on the Balıkesir – Manisa highway, you can see the signs showing our facility by leaving the highway in Gelenbe town and connecting to the Dualar Village road.

T: 0 236 594 10 11
F: 0 236 594 10 12