• BERGRES WPP

Electricity Generation

245.000.000 kWh/year

Installed Capacity

21 x 3,2 MW (GE Energy 3.2 – 103) + 1 x 2,75 MW (GE Energy 2.75 – 103)

69,95 MWm / 69,95 MWe

Year of Commissioning

2017

Location

İsmailli Köyü Mevkii, Bergama, İzmir Take the Zeytindağ turnoff on the İzmir – Çanakkale highway. You can reach our facility after passing the villages of Zeytindağ, Bozyerler and Koyuneli respectively.

T: 0 232 669 10 10
F: 0 232 669 10 04